We are an Industry Leader in drilling, completions, geology and geophysics

Well Construction

  • Date: 2018
  • Location: Offshore Nova Scotia, Canada
  • Rig Intake
  • OA Management
  • Project T&C Assurance

  • 2018
  • First Annual Hull and Structural Drone Inspection onboard Suncor’s Terra Nova FPSO

  • Date: 2017/2018
  • Bleed-Back Package Installation, Approval and Commissioning

  • Date: Summer 2017
  • Training and Competency Assurance for Rig Lead Positions on the Regina Allan

Multi-well sour gas land development. Provided project planning:

  • Planning Engineers Formulated Development Plan
  • Composed field wide design basis
  • Formulated intervention strategy for multi-well abandonment program

Deepwater exploration Well China Baiyun 18-1-1 (Drill and P&A) projects. Provided project planning, management and execution team:

  • Planning Engineers
  • Wellsite Supervisors
  • Rig Based Supervisors
  • HSE Specialists
  • Logistics Specialists
  • Wellsite Geologists
  • Petro Physical Consultants

  • Date: 2015 – 2017
  • Supplied Geologists, Project Managers, Drilling
  • Engineers, HSE Offshore Specialists
  • Rig Intake and Certificate of Fitness Management
  • Training and Competency Management

  • Date: 2015- 2017
  • Supplied Drilling Package Commissioning Lead

  • Date: 2015 – Present
  • Location: Alberta, Canada
  • Supply of Logistics Coordinators

  • Date: 2014-2018
  • Location: Newfoundland & Labrador
  • Supplied Project Engineer

  • Date: 2014-2018
  • Location: Newfoundland & Labrador
  • Supplied Interface Engineers and Project Engineers

  • Date: 2013 – 2014
  • Location: Liberia, Ghana and Sierra Leone
  • Engineering, Planning, Wellsite Supervisors. HES
  • Specialists, Logistics Specialists, Wellsite Geologists, and project execution
    • Deepwater Exploration Well Liberia Gosh Tern 1 (Drill and P&A)

  • Date: 2012 – 2013
  • Location: Sierra Leone
  • Provided Project Execution Team – Rig Based
  • Supervisors

  • Date: 2012-Present
  • Location: Kurdistan
  • Supply of Engineers, Planning Engineers, Wellsite
  • Supervisors, Wellsite Geologists, Wireline QAQC, Contracts Specialists, and Project Execution

  • Date: 2011 – 2013
  • Drill and P&A for Well Margaree O-55
  • Engineering, Planning, Execution, and Rig Intake
  • ·Supplied Wellsite Supervision, HES Specialists, Logistics, and Wellsite Geologists

  • Date: 2011 – 2015
  • Location: Newfoundland & Labrador
  • Drill Stem Test (DST)
  • Completions
  • Wellsite Supervision
  • G&G Support (Wellsite Geology,
  • Petro-physical)

  • Date: 2011 – 2015
  • Location: Offshore Angola
  • Supplied Wellsite Supervision and Engineers for multi well development.

  • Date: 2010 – 2013
  • Location: Newfoundland & Labrador
  • DST (Drill Stem Test)
  • Planning/Supervision
  • Logistics
  • G&G Support (Wellsite geology,
  • Petro-physical)

  • Date: 2010 – Present
  • Location: Gulf of Mexico
  • Supply of Wellsite Supervisors

  • Date: 2008 – 2010
  • Multi-well subsea exploration project. Provided project planning, management and execution team:
    o Planning Engineer
    o Superintendent
    o Rig Based Supervisors
    o Logistics Personnel
    o Lead Operations Engineer
    o Testing Engineer

  • Date: 2008 – 2010
  • Engineering, planning, wellsite supervision, logistics and execution. Rig intake.
    o Deepwater Exploration Well Lona O-55 (Drill and P&A)

  • Date: 2008 – 2013
  • Provided project planning, management and execution team:
    o Planning Engineers
    o Rig Based Supervisors
    o Wellsite Geologists

  • Date: 2008 – Present
  • Location: Newfoundland & Labrador
  • Supply of Project Managers, Drilling Engineers, HES Offshore Specialists, Rig intake, Logistics Specialists, Training &Competency Specialists.
  • Development Well G-90 Z (Sidetrack, Drill and Complete)
  • Development Well L-98 10 (Drill and Complete)
  • Development Well L-98 1Y (P&A, Sidetrack, Drill, Complete)
  • Development Well L-98 12 (Drill and Complete)
  • Development Well L-98 13 (Drill and Complete)
  • Exploration Well E-19 (Drill, P&A)
  • Exploration Well Ballicatters M-96Z (Sidetrack, Drill, DST)
  • Numerous FEED Studies
  • Intervention and well workovers

  • Date: 2005-2006
  • Location: Newfoundland & Labrador (Great
  • Barasway F66 Well) Engineering
  • Project Planning and Execution
  • Rig Intake

  • Date: 2006
  • Location: Newfoundland & Labrador
  • Provided project planning, management and execution team:
    o Planning Engineers
    o Rig Based Supervisors
    o Logistics Personnel
    o Operations Engineers
    o Wellsite Geologists
    o Petro-Physical QAQC

Subsea

  • Date: 2018
  • Location: White Rose Field, Offshore Newfoundland & Labrador
  • Together with our partner Flexlife, WSI completed a full annulus inspection and testing of Husky’s riser system for the SeaRose FPSO
  • Providedproject planning, management and execution team including:
    • Technical Support
    • Daily Progress Tracking
    • Inspection and QAQC

  • Date: 2012 – 2014
  • Location: White Rose Field, Offshore Newfoundland & Labrador
  • Subsea tieback of new excavated drill center to the SeaRose FPSO
  • Provided team of engineers and techs to plan and install new subsea extension to existing field, including provision of:
    • Subsea Engineers
    • Offshore Representation
    • Installation Planning
    • Fabrication Project Management

  • Date: 2014 – 2015
  • Location: Cabot Strait, Newfoundland & Labrador and Nova Scotia, Canada
  • WSI supplied marine engineering for planning, testing, deli very and installation of HVdc subsea cables linking the Provinces of Nova Scotia and Newfoundland.

  • Date: 2014
  • Location: Equatorial Guinea
  • Planning and supervision of a LIV program (Light Intervention Vessel) for a multi-well West African subsea development. Interventions included gas lift valve change outs, remediation of well integrity issues and zonal isolations.

  • Date: 2014
  • Location: Offshore Newfoundland & Labrador
  • The LIV involved in Equatorial Guinea mobilized to Newfoundland to conduct a similar program. Planning and supervision of a LIV program (Light Intervention Vessel) for a multi-well West African subsea development. Interventions included gas lift valve change outs, remediation of well integrity issues and zonal isolations.

  • Date: 2012
  • Location: Terra Nova Field, Offshore Newfoundland & Labrador
  • Equipment supply and installation for subsea expansion / removal and replacement of subsea flowlines and risers
  • WSI personnel we immersed in the project team to provide engineering and offshore representation during the planning and execution of the riser and flowline replacement project as well as supported delivery, testing and installation of new subsea equipment for drilling and production expansion.

QAQC

WESI offers land or offshore (FPSO, Drillship, Semi, Jack-up) aerial data capturing services for equipment inspection, survey/mapping and modelling in partnership with AeroVision Canada Inc.(aerovisioncanada.com).

  • Chevron Gosh Tern 1
  • Set-Up of Quality Program
  • QAQC of all Drilling, OCTG,
  • Wellhead and Surge Tools
  • Development of Quality Procedures
  • Quality Advisory and Oversight of all Suppliers

  • Location: Nova Scotia
  • Development of Project Quality Plan
  • Development and Advisory of Supplier Service Quality Plans
  • QAQC of all Drilling Equipment, OCTG, Wellhead and Surge Tools, etc.
  • Supplier API Q2 Audits /
  • Supplier Process Audits
  • Failure Investigations
  • Management of TPI Services (AEC/GOM)
  • TPI Services

  • ·Location: Nova Scotia
  • Development of Project Quality Plan
  • Development and Advisory of Supplier Service Quality Plans
  • QAQC of all Drilling Equipment, OCTG, Wellhead and Surge Tools, etc.
  • Quality Oversight of Supplier Technical Audits
  • Failure Investigations
  • Management of TPI Services (AEC and GOM)
  • TPI Services (AEC and GOM)

  • Location: Alberta/BC
  • QAQC of all Drilling and Completions Equipment
  • Failure Investigations
  • Supplier Quality Audits
  • Rig Site Quality Oversight

  • Review of all Akita 40 rig pressure containment systems/piping
  • To confirm validity of pressure tests
  • Verify pressure tests complete
  • Final QAQC Report